Buses in Southwark – have your say

Rotherhithe and Bermondsey​

  • loss of 50% of routes (3 of 6) from London Bridge to Liverpool Street.  ​
  • no direct connection between Rotherhithe and the north of the river (change at LB required) ​
  • there would be no direct route from London Bridge to Holborn​
  • 521 route replaced with a combination of 133 and 59 routes, resulting a five-minute walk from each other for interchange
TFL's consultation closed on 7 August, but the council is continuing in its efforts to convince TfL not to take these proposals forward, and has set out its concerns on behalf of the borough in its Formal consultation response (pdf, 709kb)

Page last updated: 01 September 2022

Privacy settings