2. Examination overview

The examination progress since the NSP submission in January 2020

3. Submission documents

Submission of the NSP and the supporting evidence in January 2020

4. Examination documents

Proposed changes to the Submitted NSP August 2020 and additional/updated information and evidence. Officer responses to the consultation. Inspector’s updates on Examination.

5. Statements of common ground

Statements of common ground with individuals and organisations

6. Hearing statements

All written statements in response to the Inspector's Matters, Issues and Questions

7. Previous stages

Previous iterations of the NSP through Regulations 18 and 19 consultations

8. Hearing sessions 

Hearing sessions are available to watch on the council’s YouTube channel

9. Main modifications 

Main modifications to the New Southwark Plan and supporting documents

10. Adopting the Plan

Inspector’s Report and Main Modifications

Timetable for consultation, examination and adopting the plan

Stages

Period

Council Assembly consideration for adoption

February 2022

Cabinet consideration for adoption

7 December 2021

Final Inspector’s Report and recommended Main Modifications received

17 November 2021

Consultation on main modifications

6 August 2021 to 24 September 2021

Inspectors post hearings letter 

28 May 2021

Hearings: Part 2

20 April to 30 April 2021

Hearings: Part 1

23 February to 25 March 2021

Deadline for written statements in response to Inspectors' questions on matters 6,9,10 

16 February 2021

Deadline for written statements in response to Inspectors' questions on matters 1,2,3,4,5,7 and 8

2 February 2021

Council's responses to the MIQ's

2 February 2021

Matters, Issues and Questions (MIQ's) from the inspectors

11 December 2020

Statement of common ground preparation

December 2020 and January 2021

Officer comments to representations received in 2020 consultation

11 December 2020

What is the New Southwark Plan?

The New Southwark Plan (NSP) will be a new borough-wide planning and regeneration strategy up to 2033. Not only will it set out planning policies to guide development, but it will also explain how development will be delivered and may inform future decisions about investment in infrastructure.

The Plan is made up of three sections:

  1. area visions - setting out the aspirations of the borough’s distinctive neighbourhoods
  2. planning policies - informing decisions on planning applications and development proposals
  3. site allocations - potential development sites with specifications for development requirements

NSP submission in January 2020

The council submitted the NSP to the Secretary of State on 16 January 2020. This started the 'Examination in Public' process, which is the last stage of the plan-making process.

On 17 January, we were allocated two Inspectors by the Planning Inspectorate. The Inspectors were David Spencer BA(Hons) DipTP MRTPI and Philip Mileham BA(Hons) MA MRTPI.

Throughout the examination process, the Planning Inspectors  examined and assessed the NSP based on the following criteria:

  • does it meet the duty to cooperate?
  • does it meet all the necessary legal requirements?
  • is it sound?
  • is it based on evidence?
  • can it be delivered?
  • does it comply with national and regional policy?

Inspectors’ initial matters and concerns in April 2020

The Inspectors provided their summary of initial matters and concerns in their letter dated 20 April 2020 (EIP14). Our full response and agreed way forward was set out in Southwark’s response to Inspectors letter dated 20 May 2020 (EIP16) and the Inspectors’ further response letter dated 2 June 2020 (EIP25). You can view these documents on the examination documents page under administrative documents.

Consultation on the Proposed Changes to the Submitted New Southwark Plan

In the Inspectors’ letter they asked us to make amendments to the New Southwark Plan and to provide more supporting information and evidence. We did this in the 'Proposed Changes to the Submitted New Southwark Plan'. We consulted on this document from 27 August to 2 November 2020. 

You can look at the responses we received about the 'Proposed Changes to the submitted New Southwark Plan' on the examination documents webpage. This includes representations received by email, letter, and the consultation hub.

There are two spreadsheets containing the consultation hub representations:

  • EIP85 contains the raw data as it was downloaded from the consultation hub
  • EIP85a is a sorted version of this file in order to make it easier to read but contains the same information as the original file.

You can look at the following consultation documents on the examination documents webpage:

  • EIP83 List of respondents and codes for representations received via email, letter and consultation hub (PCSNSP) 
  • EIP84 Representations received via email or letter (PCSNSP) 
  • EIP85 Representations received via the consultation hub raw data (PCSNSP) 
  • EIP85a Representations received via the consultation hub sorted data (PCSNSP) 
  • EIP91 PCSNSP consultation responses - Foreword
  • EIP92 PCSNSP consultation responses - IP2 Transport Infrastructure
  • EIP93 PCSNSP consultation responses - IP3 CIL and S106 Planning Obligations
  • EIP94 PCSNSP consultation responses - IP6 Monitoring Development
  • EIP95 PCSNSP consultation responses- IP7 Statement of Community Involvement
  • EIP96 PCSNSP consultation responses - Purpose and content
  • EIP97 PCSNSP consultation responses - SP1 a and b
  • EIP98 PCSNSP consultation responses - SP1 not including P11
  • EIP99 PCSNSP consultation responses - SP6 Cleaner, greener, safer
  • EIP100 PCSNSP consultation responses - Strategic Vision
  • EIP101 PCSNSP consultation responses - Southwark Today
  • EIP102 PCSNSP consultation responses - Area visions and site allocations
  • EIP103 PCSNSP consultation responses - AV01 Aylesbury Area Vision
  • EIP104 PCSNSP consultation responses - Strategy
  • EIP105 PCSNSP consultation responses - Strategic targets and key diagrams
  • EIP106 PCSNSP consultation responses  - AV03 Bermondsey Area Vision and Sites
  • EIP107 PCSNSP consultation responses  - AV04 Blackfriars Area Vision and Sites
  • EIP108 PCSNSP consultation responses - AV11 London Bridge Area Vision and Sites
  • EIP109 PCSNSP consultation responses - SP4 Strong local economy
  • EIP110 PCSNSP consultation responses - P11
  • EIP111 PCSNSP consultation responses – SP5 Healthy, active lives
  • EIP112 PCSNSP consultation responses – AV02 Bankside and the Borough
  • EIP113 PCSNSP consultation responses – AV05 Camberwell Area Vision and sites
  • EIP114 PCSNSP consultation responses - AV13 Old Kent Road Area Vision and Sites
  • EIP115 PCSNSP consultation responses - AV09 Elephant and Castle Area Vision and Sites
  • EIP116 PCSNSP consultation responses - AV15 Rotherhithe Area Vision and Sites
  • EIP117 PCSNSP consultation responses - Legal and policy compliance
  • EIP118 PCSNSP consultation responses - Miscellaneous
  • EIP119 PCSNSP consultation responses - SP3 Best start in life
  • EIP120 PCSNSP consultation responses - AV14 Peckham Area Vision and sites
  • EIP121 PCSNSP consultation responses - SP2 Regeneration for all
  • EIP122 PCSNSP consultation responses - Evidence base

These representations and officer responses were sent to the Inspectors when the consultation finished.

Meeting with Inspectors

On 6 November 2020, planning officers and the EiP Programme Officer from Southwark Council (LBS) met with the Planning Inspectorate (PINS) to discuss how to do a virtual Examination in Public. The minutes of this meeting have been added to the webpage. 

  • EIP86 Minutes of meeting with PINS 061120 

Matters, Issues and Questions (MIQs), guidance note and draft hearing programme

The Inspectors issued their Matters, Issues and Questions (MIQs), an accompanying guidance note and a draft hearing programme for the examination.

By Monday 11 January 2021, the Programme Officer received emails or letters from those who wish to be heard at the Examination Hearings, indicating which sessions, relevant to their representations, they wanted to attend. This included confirmation from those who indicated in their initial representations that they wished to participate.  

In line with guidance from PINS, the deadline for any written statements was 2 February 2021. We accepted some written statements up to Tuesday 16 February 2021. 

Update from PINS in early 2021

The inspectors issued:

  • a response to Southwark Law Centre dated 5 January (EIP123)
  • a letter regarding Publication London Plan dated 6 January (EIP124)
  • the privacy notice for virtual hearings in respect of data protection dated 7 January (EIP125)

You can view these documents in the examination library.

Updated hearings schedule

The hearings took place in two parts. The first part opened on 23 February 2021 at 10am and hearings were held into the proposed strategy and policies of the New Southwark Plan.

The second part took place on 20 April and considered the proposed sites in the Plan, together with policies for the delivery of the plan.

The Examination in public

The public hearing sessions were chaired by the Inspectors. These were an essential part of the examination process. Participants included council officers, and people or organisations that submitted a representation during Regulation 19 consultation and whom were invited by the Inspectors.

Main Modifications

The Examination in Public (EiP) hearing sessions for the New Southwark Plan (NSP) ended on Friday 30 April 2021. The sessions are available to watch on Chapter 8 - Hearing sessions. Following the Examination in Public, the council asked the Inspectors under section 20(7C) of the 2004 Planning and Compulsory Purchase Act as amended) to recommend ‘main modifications’  (changes that materially affect the policies) to make a submitted local plan sound and legally compliant (EIP233). The Main Modifications were consulted on for 7 weeks between 6 August and 24 September 2021.

Chapter 9 - Main modifications provides more information on the next steps of this round of consultation.

Adopting the Plan 

We have now received the Inspector’s Report and recommended Main Modifications. These are provided at Chapter 10 – Adopting the Plan. This concludes the Examination in Public of the Plan. The next steps for adopting the Plan are provided at Chapter 10.

Consultation responses to the Main Modifications consultation are provided at Chapter 10 – Adopting the Plan.

The purpose of the examination webpage

To facilitate the smooth running and transparency of the examination, this page provides access to all the relevant documents, including Submission Version NSP and the supporting documents along with the previous versions of the plan and documents. 

The programme officer

The council has appointed a programme officer for the examination process, who undertakes the administration of all aspects of the examination under the Inspector’s direction, including arrangement of hearing sessions and all communications outside the hearing sessions between the Inspector, Southwark Council and other parties. 

Programme officer: Jacqueline Christie

Planning policy mailing list

You can sign up to MySouthwark and opt-in to receive planning policy consultation updates on your profile.

Updates/new documents to the examination:

6 December 2021

  • The Southwark Plan 2022 for adoption (February 2022)
  • Supporting documents to the Southwark Plan 2022
  • Consultation Report on the Main Modifications to the New Southwark Plan

24 November 2021

  • Final Inspector’s Report to the New Southwark Plan
  • Main Modifications and Appendices
  • Main Modifications Consultation Responses

10 August 2021

  • EIP178a - New Southwark Plan Monitoring Framework (August 2021)
  • EIP240 - Housing Viability (update June 2021) 

6 August 2021

  • EIP211 - Rescinding note
  • EIP198b - Update 5+15 year land supply report (July 2021)
  • EIP219 - Main Modifications to the New Southwark Plan
  • EIP219 - Main Modifications - Appendix 1 - Key Diagram Updates
  • EIP219 - Main Modifications - Appendix 2 - MM29 Residential design - Aylesbury space standards
  • EIP219 - Main Modifications - Appendix 3 - Policy P47 Figure 7 map school exclusion zones
  • EIP219 - Main Modifications - Appendix 4 - Cycle and car parking tables 10-12
  • EIP219 - Main Modifications - Appendix 5 - Annex 2 Housing Trajectory
  • EIP219 - Main Modifications - Appendix 6 - Annex 4 NSP Monitoring Framework
  • EIP219 - Main Modifications - Appendix 7 - Annex 5 - AAP policies and sites replaced by NSP
  • EIP219 - Main Modifications - Appendix 8 - Area Vision Maps
  • EIP220 - NSP Schedule of Changes to Policies Map
  • EIP224 - Integrated Impact Assessment Report and Appendices July 2021
  • EIP225a - Equalities Impact Assessment summary June 2021
  • EIP225b - Equalities Impact Assessment Full Assessment June 2021
  • EIP225c - Equalities Impact Assessment Appendices June 2021
  • EIP237 - Directors Report - NSP Main Modifications
  • EIP238 - Additional modifications to the New Southwark Plan
  • EIP238 - Additional Modifications - Appendix 1 - Contents Page
  • EIP238 - Additional Modifications - Appendix 2 - P52 Figure 9 Southwark Cycle Spine
  • EIP238 - Additional Modifications - Appendix 3 - Annex 3 Policies Map Schedule

18 June 2021

  • EIP198a - 5 and 15 Year Housing Land Supply and Appendices (June 2021)

10 June 2021

  • EIP59A - Energy Background Paper Addendum (June 2021)

8 June 2021

  • EIP236 - Southwark’s Post Hearings Letter (28 May 2021)

3 June 2021

  • EIP217 - Matter 9 Viability Note (update 2 June 2021)
  • EIP231 - BNPPRE - Affordable Workspace Note - further high-level testing analysis (May 2021)

2 June 2021

  • EIP188a - Council's response to Final Action List Part 1 Hearings (updated 2 June 2021)
  • EIP232 - Explanatory Note to clarify NSP49 ancillary uses

27 May 2021

  • EIP82b - Site Allocations Methodology Report (May 2021)
  • EIP188a - Council's response to Final Action List Part 1 Hearings (updated 21 May 2021)
  • EIP233 - Section 20(7)c Letter
  • EIP234 - Reasonable Alternatives Note

24 May 2021

  • EIP188a - Council's response to Final Action List Part 1 Hearings (updated 21 May 2021)

20 May 2021

  • EIP207 - Strategic Policies Note

10 May 2021

  • EIP228 - Southwark Cycling Spine
  • EIP229 - Area Vision Boundaries Existing and Proposed

6 May 2021

  • EIP230 - Southwark Local Plan advice

30 April 2021

  • EIP202a - Aylesbury Background Paper Update
  • EIP206 - P27 Access to employment and training Note
  • EIP214 - P7 Wheelchair accessible and adaptable housing Note
  • EIP215 - Purpose Built Shared Living Note
  • EIP217 - Matter 9 Viability Note - Update
  • EIP218 - P61 Reducing Waste Minor Modifications Justification

29 April 2021

  • EIP227 - Enforcement Policy (Jan 2017)

28 April 2021

  • Inspectors Agenda for Final Administration Session (Chapter 8: Hearing Sessions)
  • EIP203 - Update to Retail Target in New Southwark Plan
  • EIP226 - Statement of Common Ground with Camberwell Society

23 April 2021

  • EIP59b - Responses to Council’s Energy Background Paper Addendum

21 April 2021

  • EIP213 - OBNF neighbourhood area boundary extension 2018

20 April 2021

  • EIP181a - Policy Area and Area Visions

16 April 2021

  • EIP188a - Council's response to Final Action List Part 1 Hearings (updated 12 April 2021)
  • EIP189a - Revised Part 2 Programme (updated 12 April 2021) (supersedes EIP189)
  • EIP204 - UCO NSP Site Allocation Modifications
  • EIP208 - Boatdweller note for the Inspectors
  • EIP209 - Policy P47 Justification for hot food takeaways buffer note
  • EIP210 - Gerald Eve on behalf of Landsec - Red Lion Court 
  • EIP212 - Southwark Council Local Implementation Plan LIP3 (April 2019) 
  • Inspectors Agendas for Matter 9 (Chapter 8: Hearing Sessions)

15 April 2021

  • Inspectors Agenders for Matter 6 and 10 (Chapter 8: Hearing Sessions)

14 April 2021

  • updated EIP82a - Site Allocations Methodology Report (updated April 2021)
  • EIP178 - New Southwark Plan Monitoring Framework
  • EIP198 - 5 and 15 Year Housing Land Supply Update (April 2021)
  • M6.00a - Southwark Council - Matter 6 update
  • M10.00a - Southwark Council - Matter 10 update
  • Inspectors Agendas for Matter 10 - Site Allocations (Chapter 8: Hearing Sessions)

13 April 2021

  • Inspectors Agendas for Matter 10 - Site Allocations (Chapter 8: Hearing Sessions)
  • EIP82a - Site Allocations Methodology Report (updated March 2021)

12 April 2021

  • corrected numbering of EIP198 - Letter from GLA on housing numbers
  • EIP201 - Statement of Common Ground with Southwark and Guys and St Thomas
  • EIP202 - Aylesbury Background Paper

7 April 2021

  • EIP192b - Statement of Common Ground with Richard Lee Part 2 (Site allocations)
  • EIP198 - Letter from Greater London Authority on housing numbers (19 March 2021)
  • EIP199 - Statement of Common Ground with Art Invest Real Estate on NSP77

6 April 2021

  • updated EIP182 
  • EIP195 - Letter to the Secretary of State on Housing Delivery Targets
  • EIP197 - Statement of Common Ground with Eileen Conn 
  • EIP197b - Statement of Common Ground with Eileen Conn - NSP72 Blackpool Road 

1 April 2021

  • updated EIP181 and re-named
  • EIP190 - Statement of Common Ground with South Dock Marina Berth Holders Association
  • EIP191 - Statement of Common Ground with Southwark Planning Network Climate Emergency Working Group
  • EIP192 - Statement of Common Ground with Richard Lee
  • EIP193 - Statement of Common Ground Southwark Living Streets
  • EIP194 - Statement of Common Ground SE5 Forum

26 March 2021

  • uploaded EIP125a - PINS Privacy Notice for virtual hearings 24 March 2021 (supersedes EIP125)

19 March 2021

  • SCG14b - Statement of Common Ground Addendum TFL and Southwark Council 18 March 2021
  • EIP186 - Bakerloo Line Extension Safeguarding Directions March 2021
  • EIP187 - Bakerloo Line Extension Safeguarding Plans March 2021
  • EIP188 - Final Action List Part 1 Hearings
  • EIP189 -  Revised Part 2 Programme (Chapter 8: Hearing Sessions) 

11 March 2021

  • EIP185 - Inspector Advice on Statements of Common Ground (Chapter 5: Statements of Common Ground)

10 March 2021

  • EIP59A - Energy Background Paper Addendum (March 2021)

9 March 2021

  • EIP183 - Southwark Nature Action Plan (2020)
  • EIP184 - Air Quality Annual Status report (2019)

8 March 2021

  • EIP182 - New Southwark Plan Climate Change Draft Timetable of Changes 

5 March 2021

  • Updated by Inspectors to Agenda for Matter 7 (Chapter 8: Hearing Sessions)

25 February 2021

  • Agenda for Matters 5a, 5b, 7, 8 and 1b (Chapter 8: Hearing Sessions)
  • EIP167 - Pupil Place Planning Report for 2020
  • EIP177 - NSP cycle and car parking standards amendments
  • EIP179 - Statement of common ground with Sport England
  • EIP181 - Area Visions Boundaries Map
  • M3.00a - Matters 3 Addendum - Policy P2

19 February 2021

  • Update by Inspectors to Agenda 4 (Chapter 8: Hearing Sessions)
  • Written statements in response to Inspectors' Matters, Issues and Questions: Matter 10 (Chapter 6: Hearing Statements)
  • M10.00 Southwark Council - Matters 10

18 February 2021

  • EIP174 - Old Kent Road Strategic Transport Study 2016
  • SCG14a - Statement of Common Ground with Transport for London (Feb 2021)
  • Written statements in response to Inspectors' Matters, Issues and Questions: Matters 6 and 9 (Chapter 6: Hearing Statements)
  • M6.00 - Southwark Council - Matters 6
  • M9.00 - Southwark Council - Matters 9
  • Matter 9.00a - Southwark and TFL joint response to Q9.3-9.5

16 February 2021

  • Agenda for Matters 1, 2, 3a, 3b and 4 (Chapter 8: Hearing Sessions)

11 February 2021

  • EIP158 - Aylesbury Update January 2021
  • EIP164 - National Design Guidance
  • EIP168 – Bakerloo line extension (2014) Consultation report (March 2015)
  • EIP169 - Bakerloo line extension Option Assessment Report (December 2015)
  • EIP170 - Bakerloo line extension Background to 2017 Consultation (February 2017)
  • EIP171 – Bakerloo line extension (2017) Consultation report (July 2017)
  • EIP172 – Bakerloo line extension Background to consultation summary report (October 2019)
  • EIP173 – Bakerloo line extension (2019) Consultation report (November 2020)
  • EIP175 - Southwark Draft Local List 2018

10 February 2021

  • Renumbered NSP Examination Draft Timetable for On-line Hearing Sessions v3 from EIP158a to EIP165a
  • EIP159 - Affordable workspace in-lieu payment calculator  
  • EIP160 - Employment and Training Programme s106 Release report (October 2020) 
  • EIP161 - Strategic Targets Background Paper
  • EIP163 - Draft Parks and Recreation strategy - Linear Park Guidelines  
  • EIP167 - Pupil Place Planning for 2020
  • M5.00 - Southwark Council - Matters 5
  • M2.00a - Q2.15 Southwark and TFL joint response

8 February 2021

  • Chapter 6: Statement of Common Grounds with the list of organisations and individuals who have requested a statement
  • EIP158a - NSP Examination Draft Timetable for On-line Hearing Sessions v3 (supersedes EIP165)
  • EIP166 - Inspector Guidance Notes for Joining Examination Virtual Hearings
  • M1.00 - Southwark Council - Matters 1
  • M2.00 - Southwark Council - Matters 2 

5 February 2021

  • written statements in response to Inspectors' Matters, Issues and Questions - 1, 2, 3, 4, 5, 7, 8 (Chapter 6: Hearing Statement)  
  • EIP162 - Southwark Council response to changes to the Use Class Order and the impact on the NSP 

4 February 2021

  • EIP128 - Old Kent Road AAP December 2020 draft  
  • EIP129 - Old Kent Road Consultation Report Dec 2020 
  • EIP130a - Old Kent Road AAP IIA Dec 2020 
  • EIP130b - Old Kent Road AAP IIA Appendices Dec 2020 
  • EIP131 - Old Kent Road AAP Habitats Regulation Assessment Dec 2020 
  • EIP132a - Old Kent Road AAP Summary of Equalities Assessment Dec 2020 
  • EIP132b - Old Kent Road AAP Equalities Impact Assessment Dec 2020  
  • EIP132c - Old Kent Road AAP Equalities Impact Assessment Appendices Dec 2020  
  • EIP133 - Old Kent Road AAP Health Impact Assessment Dec 2020  
  • EIP134 - Old Kent Road AAP Cabinet Report Dec 2020 
  • EIP135 - Old Kent Road AAP Consultation Plan Dec 2020 
  • EIP136 - Bakerloo Line Extension regeneration opportunities document  
  • EIP137a - Bakerloo Line Extension Local Economic Impact Assessment July 2020 
  • EIP137b - Executive Summary - Bakerloo Line Extension Local Economic Impact Assessment July 2020
  • EIP138 - TFL Financial Sustainability Plan (published 11 January 2021) 
  • EIP139 - OKR 3 Mandela Way, OKR 4 Dunton Road Feasibility Study (June 2020)
  • EIP140 - OKR11 Six Bridges Feasibility Study (August 2020)
  • EIP141 - OKR13 B+M Site Old Kent Road (March 2020)
  • EIP142 - OKR18 Folgate Estates Massing Study (October 2020) 
  • EIP143 - Old Kent Road Opportunity Site 13 (September 2019)
  • EIP144 - OKR13 Curry's PC World massing study (August 2019)
  • EIP145 - South Bermondsey Dive Under masterplan (October 2020)
  • EIP146 - Hazardous Substance Consent Order Revocation letter (March 2020)
  • EIP147 - Old Kent Road and Aylesbury Utility Report July 2019 
  • EIP148 - Old Kent Road Open Space Background Paper Jan 2021
  • EIP149 - Old Kent Road Existing and Proposed Jan 2021
  • EIP150 - Old Kent Road Accommodation Schedule Jan 2021
  • EIP151 - Old Kent Road phasing plan (January 2021)
  • EIP153 - Article 4 Direction HMO Bywater Place Committee Report 
  • EIP154 - Article 4 Direction HMO Henshaw Street Committee Report  
  • EIP155 - Great Estates Programme Cabinet Report and Appendix 1 Vision and Approach  
  • EIP156 - Southwark Housing Strategy 2020 (supersedes SP104) 
  • EIP157 - Publication London Plan 2020 
  • EIP158 - NSP Examination Draft Timetable for On-line Hearing Sessions v2 (supersedes EIP89)

26 January 2021

  • EIP152 - Housing Delivery Test Results (25 January 2021)

12 January 2021

  • EIP126 - PINS Hearing Notices (11 January 2021)
  • EIP127 - Southwark NSP Privacy Notice (12 January 2021) 

7 January 2021

  • corrected the numbers of EIP111 - EIP122 PCSNSP consultation responses
  • uploaded EIP123 - PINS response to Southwark Law Centre (5 January 2021)
  • uploaded EIP124 - PINS letter regarding Publication London Plan (6 January 2021)