Jump to content | Change font size and colours You are not signed in. Sign in or register?

Advice and help with building control consent

The steps
  1. Complete and sign the applicable application form
  2. Provide a copy of an ordinance survey map, outlining the property where the works are to be carried out
  3. Provide two copies of the plan showing the existing layout, if applicable, of your building works
  4. Provide two copies of the plan, providing details, specifications and elevations of the proposed work you wish to carry out to your building or structure
  5. Provide engineering calculations that relate to the proposed building works if applicable
  6. Attach the application fee
  7. Drop in or post everything to Southwark building control at the below address.

Bookmark this page

Share this page

Building control

Address: PO Box 64529
London
SE1P 5LX

Tel: 0845 600 1285

Fax: 020 3357 3101

building.control@southwa
rk.gov.uk

 

Choose a topic...

Contact us

Southwark Council
PO BOX 64529
London SE1P 5LX

020 7525 5000

csc@southwark.gov.uk

More contacts...

Follow us What is this?

  • RSS feed
  • youTube channel
  • twitter account
  • facebook fan
  • flickr photostream
.